Pile Cage Assembly Drawings
ROMTECH’s AutoCad Detailing Facility Routinely:
Defines the exact cage format by producing a working drawing using customer contract documents. This usually takes place a few days prior to delivery of the relevant cage type and enables all parties to progress forward from the original contract rebar drawing/schedule stage.
The drawing will cover the scheduled main and transverse reinforcing bars and cage dimensions but can also include lifting points, skid spacer locations, debonding isofoam, sonic coring/inclinometer pipes and couplers. Where clamped cage formers are used, the drawing will state the recommended torque setting.
ROMTECH Drawing Service – Typical Examples

Factory Machine Welded Pile Cages Factory Machine Welded Factory Trestle Welded Pile
(Conventional Splice) Pile Cages (Coupled) Cages (One cage per pile)
ROMTECH Drawing Service – Typical Examples
ROMTECH:
- works with the customer to obtain Clients approval of the ROMTECH drawing
- issues the pile cage drawings along with any necessary component drawings to ROMTECH’s Works for cage manufacture
- issues the cage drawing for factory welded cages to site for inspection of delivered consignments, for ongoing reference and for submission to the Client
- offers a revision service for drawing updates
- maintains a long term database for completed drawings for use by customers and their Clients for the purpose of “as-built” records
- issues the cage drawing for site-assembled cages to site for the steelfixing and site inspection of completed cages
Make
an enquiry
Email this item
Print this page

Related Products: