Thursday 20 November 2008
+44 (0)870 011 2883

Search

 

Login


 

 



Need help signing in?

Online Poll

Have you found the information you were looking for?


Archived Polls

Home >> Products >> Piling >> Pile Cage Accessories >> Effective 'Temporary-Works' Support of Cage Within Pile Bore

Effective 'Temporary-Works' Support of Cage Within Pile Bore

Heavy Duty, Clamped-on Cage Feet

  • Mobilises soil bearing capacity to provide massive toe-support to heavy pile cages during installation
  • Prevents cage dropping during installation or casing-extraction so avoiding the liabilities of low cages and the unscheduled need for expensive repair couplers
  • Simple, scientific, torque-controlled integral clamps are rapid and easy to work with, so avoiding the need to site-weld the feet to the cage whilst making the feet secure
  • Use of integral clamp allows feet to be detached from previously fitted-out cages in order to ‘telescope’ the foot to alter its projection below the cage to allow for changing ‘toe bearing’
  • Projection of cage foot through bottom-end concrete of pile has been deemed acceptably durable on CTRL projects, Terminal 5 Heathrow and other prestigious contracts due to the anaerobic nature of the environment at the base of the pile
  • Design service available
 





Make an enquiry Email this item Print this page

Related Products: