Since Beamform is 120mm thick, the customer will be able to stack units
where depths exceed the maximum height available (750mm). This is
achieved quickly, safely, accurately and very easily.
An
example of how this works is shown below, where Beamform was used on a
Hypermarket development which had 900mm deep pile caps and 600mm deep
beams to the perimeter of the new store.
From General
Arrangement (GA), Reinforced Concrete (RC) drawings in conjunction with
Bar Schedules, we were able to do a complete take-off of Beamform
units, prefab cages and required spacers.
The Beamform units
are installed in the normal manner as previously described. Where the
units are stacked around the pilecaps they tie in to the units on the
beams with the tongue/grooved ends.
In this instance, by
utilising ROMTECH prefab cages and Beamform, the Contractor not only
recovered a two week programme slippage, but completed the pour of the
perimeter beam foundation three weeks ahead of programme, without
losing any quality on the finished product.
Since completing
this contract, the Contractor has continued to use both ROMTECH prefab
cages and Beamform on all suitable projects. Indeed, this company
builds in the speed of installation advantages over traditional methods
when tendering for work; thus giving them a distinct advantage over
competitors.
View of Pile Cap and Ground Beam intersection with Beamform fitted Prior to Back-Fill.

View of above section back filled and Poured.